PROJECT CHALLENGES
The project required reliable water pressure and high-performance hot-water delivery within a limited plant room footprint. As with many central London residential properties, restricted access and space constraints meant equipment needed to be compact, efficient and suitable for installation in confined areas.
PROJECT SOLUTION
Dutypoint provided a compact, dual-system solution designed to maximise performance while minimising footprint. The solution incorporated a ScubaTANK® for efficient water boosting and an Element Hot Water Cylinder for high-pressure hot water delivery.
The system was configured to ensure that both boosted cold water and high-pressure hot water could be delivered without the need for extensive plant space or complex on-site integration. The equipment was selected to prioritise compactness, ease of installation and reliable performance in a constrained residential environment.
- ScubaTANK® (WX1-5060-0175) – compact water boosting solution designed for restricted plant room installation
- Element Hot Water Cylinder (EUHPC40045V-RH) – high-pressure hot water solution integrated within a space-efficient system layout
- Equipment selected to minimise footprint while maintaining performance requirements
- Simplified system configuration to suit tight access and installation conditions
THE RESULT
The completed installation provides reliable water pressure and consistent high-performance hot water throughout the property. By combining compact boosting and high-pressure hot water technology, Dutypoint delivered an efficient solution tailored to the constraints of a prestigious central London residence.