PROJECT CHALLENGE
As with all highway projects, temporary traffic management causes extra challenges for all drivers and workers, not to mention the extra health and safety risks and the unpredictable weather conditions. Programmes are tight, designs have to be carefully thought through and reviewed from different angles.
PROJECT SOLUTION
With the original programme suggesting two concrete wet wells and confined space installations, the contractor was happy to work with Dutypoint to design a complete package system.
This greatly reduced installation time, gave the installers a more flexible programme and reduced potential health and safety risks on site.