PROJECT CHALLENGES
The project required a complete plant room solution to be installed at roof level of Infinity Labs, Southampton, with restricted height available due to additional structural steelwork above the enclosure.
Key challenges included:
- Carefully selecting the equipment to stay within the height restriction
- Coordinating a complete plant room solution without impacting the overall construction programme
- Maintaining build quality while delivering a fully integrated offsite-manufactured package
PROJECT SOLUTION
Dutypoint designed and manufactured a bespoke packaged plant room, carefully selecting plant and equipment to remain within the available height envelope without compromising system performance.
The fully prefabricated solution incorporated LTHW and CHW buffer vessels, pumps, pressurisation units, and side-stream filtration equipment, providing a complete mechanical package ready for installation and connection on site.
Factory-controlled assembly ensured consistent quality throughout manufacture, resulting in a fully integrated, pre-tested solution ready for efficient installation on site.
THE RESULTS
The packaged plant room was delivered to the site as a fully integrated, factory-built solution, enabling rapid installation and helping accelerate the overall construction programme. Manufactured under controlled factory conditions, the project achieved a high-quality finish. It was delivered successfully, providing the client with a reliable, ready-to-connect mechanical solution.
Products Featured
- Packaged Plant Room
- LTHW Buffer Vessels
- CHW Buffer Vessels
- Pumps
- Pressurisation Units
- Side Stream Filtration Systems