PROJECT CHALLENGE
North Lindsey College faced a combination of space constraints and high water demand across multiple departments. The on-site salon, construction learning areas, and wash facilities required reliable pressure and efficient water management. Additionally, a Category 5 backwash system was needed to handle water runoff from these high-usage zones, ensuring compliance with safety regulations.
PROJECT SOLUTION
To address these challenges, Dutypoint supplied two solutions:
Slimline Booster Set: Chosen for its compact design, this high performance cold water booster set efficiently boosts water pressure in areas where space is limited, ensuring a steady supply across the college’s high-demand facilities.
UniBreak™ System: Installed to manage water runoff, particularly from the construction learning areas, salon, and wash facilities. This WRAS-approved integrated tank and pump system meets Category 5 regulations, ensuring safe disposal and preventing contamination risks.
Both systems work in tandem to deliver consistent and reliable water pressure throughout the college, supporting students and staff across a wide range of vocational and academic disciplines.
If your educational institution requires an efficient water-boosting solution tailored to your needs, contact Dutypoint today to discuss how we can help.