About Dutypoint

Booster set solution for food production facility

High-performance water pressure and storage solution,

Delivered and installed in six weeks.

Industry sector

Food & Beverage

Project type

Water Booster and Integrated Storage Solution

PROJECT SUMMARY

A food production facility in Swansea required a high-capacity water storage solution to maintain consistent pressure across its manufacturing operations. Dutypoint supplied two ScubaTANK® combined tank and booster sets within six weeks, delivering a straightforward installation and reliable water pressure meeting the factory’s intense production demands.

PROJECT REQUIREMENTS

Reliable water pressure is critical in food manufacturing environments where cleaning processes, production equipment, and hygiene systems rely on consistent supply.

To support daily operations across the factory floor, this client in Swansea required:

  • Large water storage capacity required to support high factory demand
  • Two high-capacity tanks were needed to ensure optimal performance and redundancy
  • Straightforward installation and commissioning required to fit the client’s operational programme and minimise disruption to production

Meeting these requirements called for a high-capacity, WRAS-approved water booster set and storage solution that could be installed quickly and perform reliably from day one.

PROJECT SOLUTION

To support reliable water supply across the client’s food production warehouse, Dutypoint supplied two WRAS-approved ScubaTANK® integrated tank and booster systems, installed as a tandem system.

Key features of this solution include:

  • Dual 2250L tanks, high volume capacity to meet the factory’s water supply demands.
  • Tandem setup provides a secure redundancy option, preventing operational downtime.
  • WRAS-approved design supports Water Regs compliance and food-hygiene environment.
  • Variable-speed drive delivering consistent pressure while adapting to changing demand.
  • Low-noise operation provides a more comfortable working environment for warehouse staff.
  • Smart monitoring allows operators to easily track tank water levels and performance.
  • Automatic dry-run protection reduces pump wear, preventing factory downtime.
  • 4.1 bar working pressure to support reliable distribution across the premises.
  • Easy-to-install packaged system which required minimal assembly and no on-site disruption.

The tanks were quoted, supplied, and installed within a six-week timeframe, helping the project remain aligned with the client’s operational schedule. Designed for straightforward installation, the packaged system required minimal assembly on-site, with clear instructions provided for pipework and electrical connections.

Following installation and chlorine cleaning, the system was commissioned without the need for adjustments to pressure or operating speeds. The installer reported that the tanks performed exactly as specified and delivered the consistent water pressure required across the production environment.

PROJECT OUTCOME

By providing a high-capacity, WRAS-compliant storage solution that was simple to install and reliable in operation, Dutypoint enabled the facility to achieve dependable water supply performance while keeping installation efficient and disruption minimal.

This project demonstrates Dutypoint’s capacity to:

  • Provide WRAS-compliant booster and tank systems for food production sites.
  • Integrate suitable high-capacity storage to meet factory water demands.
  • Build redundancy and longevity into system design, preventing future downtime.
  • Install and commission a packaged system with minimal on-site disruption.
  • Design and deliver a complete solution within the client’s strict schedule.

Specifying a water system for food manufacturing? Get in touch with our team today for WRAS-compliant integrated booster and storage solutions.