Case Study: The new build stately home
Share this

Case Study: The new build stately home

PROJECT SUMMARY

Prestigious new build project in Surrey spread over 3 floors with 6 bathrooms and swimming pool.

PROJECT CHALLENGE

The property required a quiet and compact water boosting solution to meet the varied demands of the residents. The system needed to be designed to cope with very low usage and then very high demand of multiple bathrooms in use at the same time.

PROJECT SOLUTION

Dutypoint provided a ScubaTANK all in one tank and pump system to deliver reliable and consistent high pressure water to every part of the home. This also allows optimum performance from demanding high end fixtures and fittings, in luxury bathrooms. Quick and easy to install in compact plant room with restricted access.

We have worked with Dutypoint on numerous luxury residential projects, all with their own unique challenges.

Dutypoint always has great advice and high water pressure product solutions which perform perfectly for each specific property.

We pride ourselves on creating bespoke plant rooms which are the engine room at the heart of every project we undertake. Dutypoint help us deliver great results for our clients.

ANDY NEWTON, DIRECTOR, FLOW PLUMBING SERVICES LTD