New Stately Home

Calendar

29th January

Author

Lloyd Preston

PROJECT SUMMARY

Prestigious new-build project in Surrey spread over 3 floors with 6 bathrooms and swimming pool.

PROJECT CHALLENGE

The property required a quiet and compact water boosting solution to meet the varied demands of the residents. The system needed to be designed to cope with very low usage and then very high demand of multiple bathrooms in use at the same time.

PROJECT SOLUTION

Dutypoint provided a ScubaTANK® all-in-one tank and pump system to deliver reliable and consistent high-pressure water to every part of the home. This also allows optimum performance from demanding high-end fixtures and fittings in luxury bathrooms. Quick and easy to install in compact plant room with restricted access.