PROJECT SUMMARY:

Sainsbury’s supermarket in the busy town centre of Brentwood, Essex, recently underwent a massive redevelopment to provide additional car parking with direct access to the store.

This project required the ground level car park to be reconfigured, demolition of the existing multi-storey car park and then the construction of a new larger multi-story carpark.

Dutypoint were called to site by the main contractor, AD Bly, to investigate the current storm water pump station and provide a solution to meet the surface water drainage demands of the new car park area and multi-story car park building.

PROJECT CHALLENGE:

The existing surface water pump station for the ground level car park had fallen out of operation due to lack of regular maintenance and required a complete overhaul to meet the drainage demands of the new car park.

The construction of the new multi-story car park also required a new dedicated surface water pump system.

PRODUCT SOLUTION:

Following a site survey, Dutypoint specified new pumps, pipework and valves to refurbish the existing pump station to deal with surface water from the new ground level car park.

In addition, Dutypoint supplied a complete packaged pump station for the new multi-storey car park. The team worked closely with the contracts manager and also the building, surface and civil contractors to minimise any disruption to the build schedule or Sainsbury’s customers.

This cross-functional involvement ensured that project was executed in a manner which allowed the store to continue trading.

The delivery and installation was managed within specific time-lines co-ordinated with other on-site contractors, and the additional pre-built packaged pump station was installed quickly in the new car park area – saving considerable time on site.