PROJECT CHALLENGE
Dutypoint were asked by the client to help them meet a critical handover date at the cricket ground. With pressure to deliver a tight turnaround of two booster sets due to a ‘last minute’ addition to the scheme, our team needed to use their expert knowledge and the wide range of stock Dutypoint offer to provide the perfect project solution.
PROJECT SOLUTION
With a large range of booster sets and components in stock and a dedicated team behind the scenes, Dutypoint are generally able to assist our customers with very fast deliveries. Dutypoint received the enquiry from the client in reference to the cricket ground on the 23rd of July and the order was officialised on the 26th. The VT booster sets were delivered to the site two days later on the 28th and installed to guarantee the handover date would be met.
Product Offering
- VT Product Range