PROJECT CHALLENGE
One of the main challenges of this project was access.
The vertical cantilever pumps are situated in a cramped, confined space above the gravity-fed sewage gully and proved to be a complex removal process in terms of health and safety.
The next obstacle came after removing the old pump from the confined gully. As these were non-standard pumps, we first had to properly identify the unit specifications and then organise for replacements to be specially made in Italy to the same criteria.
PROJECT SOLUTION
Understanding the urgency of the pumps and the associated health and safety risks around septicity, we were able to organise a dedicated courier to drive the 900 miles to collect the replacement pumps from the Italian factory and delivered them to site within 22 hours of being manufactured.
The replacement pumps were a perfect fit and were quickly installed by MetroMech team without any problems.