PROJECT CHALLENGE
As such an important enforcement authority, all services at the port need to be at optimum efficiency. Inconveniences on site could lead to issues with internal welfare and could reduce the output which could cause delays.
Dutypoint was contacted by the port authorities to supply a quick booster set solution for the T2 inspection building to prevent issues on site.
PROJECT SOLUTION
Dutypoint delivered a VT booster set to the port within a week to keep operations up to standard. We keep a large range of VT units in stock so our team were able to deliver one to the port when and where needed.
The VT booster set is the ideal solution for any new and retrofit applications and comes with anti-seize technology during low or zero usage to prevent failure.