Leamington Gospel Hall

Author Lloyd Preston Calendar 2 January 2019
Outside Leamington Gospel Hall

Space and pressure issue solved with an intelligent tank system.

Space struggle sorted.

PROJECT BACKGROUND

Industry sector End user

Project type Conference Centre

Client Leamington Meeting Room Trust

Product supplied
QuadraTANK

PROJECT SUMMARY

Leamington GHT contacted Dutypoint Systems as they were extending their conference centre and adding additional WCs and hand washing basins. The current site operated via the mains water but, to accommodate the additional usage, there was a need for on-site water storage and increased pressure throughout the system.

PROJECT CHALLENGE

With a serious lack of plant room space, a standard break tank and booster set wasn’t an option.

PROJECT SOLUTION

Dutypoint Systems QuadraTANK was the perfect option. Providing a single piece break tank and kiosk, suitable for installation externally and available in various sizes to suit whatever application you are working on.