Montague Park Urban Centre

Author Lloyd Preston Calendar 6 April 2021
Case Study - Montague Park Urban Centre

Guaranteed winning results for residential development.

Reliable pressure.

PROJECT SUMMARY

An award-winning new build development of homes and apartments in Wokingham needed a pump solution that would guarantee safe and reliable water pressure on every floor of the building. The new apartment building consists of four floors and living accommodation is located on every floor. To guarantee adequate water pressure to every apartment, cold water booster sets, multistage pumps and storage tanks were required.

PROJECT CHALLENGE

The requirement for booster sets was established late in the project and very close to completion. At this stage, the development was built and all mechanical plant space was fully allocated. The contractors had to meet minimum storage requirements and boosted cold water duties within the minimal space available.

PROJECT SOLUTION

The Dutypoint slimline booster set was an ideal solution, meaning that the triple pump booster set could be installed alongside an internally flanged 4,250-litre actual capacity tank within a new space allocation of 1790mm width x 2500mm length.

Using the brief the client provided, Dutypoint selected the correct size Slimline booster and a 3m tall internally flanged tank.

The unique design of the slimline booster set (with its 352mm dimension) allows for the booster set to be installed up against a building or tank wall, as there is no requirement for maintenance clearances at the back.

Product Offering

  • VS3-5080-015T Slimline Booster Set
  • Duty: 3 l/s @ 5.5 Bar Duty / Assist / Standby
    Overall Dimensions: 1600 x 352 x 1710mm LxWxH
  • Variable Speed Controlled Multistage Pumps
  • 4250 litre actual capacity totally internally flanged tank
    External Dimensions: 2000 x 1000 x 3080mm LxWxH
https://www.dutypoint.com/app/uploads/2023/05/logos.jpg