Case Study - Pinner Care Home

'Quik' thinking reduces development time for Pinner Care Home.

Digging deep.

PROJECT BACKGROUND

Industry sector Healthcare

Project type New Build 76 Bed Extra Care Facility

Client TLC Group

Architect Carless & Adams Partnership

Product supplied
2m diameter, 6m deep chamber
50mm pipework
16,440 ltrs storage
50mm solids handling pumps
Volume of concrete required 7.5m3 (approximately 80% saving over against traditional method of installing a packaged PPS).

PROJECT SUMMARY

New build of an extra care facility on a brownfield site in Pinner, Middlesex. The building will consist of 3 floors, including a basement with living accommodation on each floor. A pump station was required to lift waste from basement level into the gravity sewers.

PROJECT CHALLENGE

The project was delayed due to the COVID outbreak so the contractor was looking for ways of reducing the programme.

PROJECT SOLUTION

The Dutypoint QuikForm® was an ideal solution. The 6m deep x 2m diameter chamber was manufactured within two weeks of order and was installed within 1 day on site. Installation involved a simple two-stage concrete pour. No bracing or water balancing of the tank was required during installation.

From a basic brief, Dutypoint selected the correct size unit with suitable HCP heavy-duty 50mm solids handling pumps. The unique design of QuikForm® incorporates a self-cleaning benched base which prevents sludge build-up and reduces maintenance, ideal for tough applications with high sewage solids content.

The Dutypoint QuikForm® is a quicker, smarter, and more efficient pump station