PROJECT CHALLENGE
The project was delayed due to the COVID outbreak so the contractor was looking for ways of reducing the programme.
PROJECT SOLUTION
The Dutypoint QuikForm® was an ideal solution. The 6m deep x 2m diameter chamber was manufactured within two weeks of order and was installed within 1 day on site. Installation involved a simple two-stage concrete pour. No bracing or water balancing of the tank was required during installation.
From a basic brief, Dutypoint selected the correct size unit with suitable HCP heavy-duty 50mm solids handling pumps. The unique design of QuikForm® incorporates a self-cleaning benched base which prevents sludge build-up and reduces maintenance, ideal for tough applications with high sewage solids content.